Heating a church effectively is not simply a matter of installing more powerful heaters. The system needs to suit the building, its pattern of use, the areas occupied by the congregation and any heritage restrictions that affect the installation.

Get those decisions wrong and a church can end up with high running costs, poor comfort and a heating system that does not work effectively for the way the building is actually used.

Whether you are replacing an ageing system, planning a refurbishment or considering infrared heating for a church, these are five common mistakes worth avoiding.

At a Glance

What Are the Most Common Church Heating Mistakes?

Five common problems are choosing a heating approach that is poorly suited to a large high-ceilinged building, heating areas that are not being used, overlooking heritage and installation constraints, comparing systems only by purchase price, and using controls that do not reflect the church's real pattern of use.

There is also one fundamental issue that sits behind all five: incorrect system sizing.

01

Choosing a Heating Approach That Doesn't Suit a High-Ceilinged Church

Many churches combine stone or masonry construction, limited insulation, high vaulted ceilings, large open interiors and external doors that may open frequently.

A heating system that relies primarily on warming the entire volume of air can therefore face a difficult task.

Why It Can Be a Problem

Warmed air naturally rises, so in a tall church a proportion of that heat can accumulate well above the occupied zone. A large building may also require considerable time and energy to raise its overall air temperature.

A Better Approach

Consider whether radiant heating is better suited to the way the church is occupied. Infrared heating directs radiant energy towards people and surrounding surfaces rather than relying primarily on warming the entire volume of air.

This can make it particularly useful where warmth needs to be directed towards pews, seating or other occupied areas.

Learn more about infrared heating for churches.

02

Heating the Entire Church When Only Part Is Being Used

Sunday worship may use much of the church, but that does not mean every event does.

Midweek services, choir rehearsals, prayer meetings and smaller gatherings may occupy only one part of the building.

Why It Can Be a Problem

Operating heating across unused areas increases electricity or fuel consumption without improving comfort for the people actually using the building.

A Better Approach

Design the heating installation around appropriate zones wherever the building layout and electrical design allow.

Depending on the church, these might include:

  • Nave or pew seating
  • Altar or sanctuary
  • Choir area
  • Side chapel
  • Meeting or community rooms

Each independently controlled heating zone requires an appropriate control arrangement. The aim is to give the church greater control over which areas operate and when.

03

Choosing a System Without Considering the Church's Heritage

The heating system cannot be considered separately from the building itself.

Churches may contain historic stonework, timber, memorials, stained glass, organs, artwork and architectural features that need to be respected when planning an installation.

Listed buildings and conservation settings may also introduce additional restrictions or approval requirements.

Why It Can Be a Problem

A technically capable heating system may still be unsuitable if installing it requires unacceptable alterations, creates excessive visual impact or conflicts with restrictions applying to the building.

A Better Approach

Consider the proposed heater position, mounting method, electrical route and visual impact early in the project rather than after the heating system has already been selected.

Our Heritage Heating range has been developed specifically for large churches and heritage interiors where both heating performance and appearance matter.

Where the building is listed or subject to conservation requirements, any necessary permissions should be established before installation.

04

Looking Only at the Upfront Purchase Price

The cheapest system to purchase is not necessarily the cheapest system to own or operate.

A proper comparison should consider the complete heating project and how it will be used over time.

Why It Can Be a Problem

Comparing equipment prices alone ignores differences in energy use, operating schedules, servicing requirements, installation work and the ability to control different areas of the church.

A Better Approach

Compare the total cost of ownership, including:

  • Equipment cost
  • Installation cost
  • Expected operating hours
  • Energy tariff and expected consumption
  • Controls and zoning
  • Servicing and maintenance requirements
  • Warranty

This produces a much more useful comparison than judging one heating system against another solely by its initial price.

05

Using a Heating Schedule That Doesn't Match Real Church Use

Churches rarely operate on exactly the same timetable every day.

Sunday services may be regular, but weddings, funerals, rehearsals, meetings, community events and seasonal services can change from week to week.

Why It Can Be a Problem

A rigid heating schedule can leave the system operating when an event has been cancelled or fail to match changes in how different parts of the building are being used.

A Better Approach

Use controls appropriate to the heating system and the way the church operates.

Depending on the system selected, this may include thermostatic control, programmable schedules and compatible remote or Wi-Fi control.

For zoned installations, each independently controlled area should have the appropriate control arrangement rather than assuming a single thermostat can manage multiple independent spaces.

Bonus Mistake

Getting the Heating Requirement Wrong

Even a well-designed heating concept can disappoint if the total required output has been calculated incorrectly.

Church heating should not be selected from floor area alone. Ceiling height, dimensions, building construction and insulation all affect the heating requirement.

Use our Wattage Calculator as a starting point for establishing the required output.

For larger or more complex church projects, heater positioning, zoning and electrical requirements should then be considered as part of the overall system design.

Church Heating Planning Checklist

Before committing to a new church heating system, make sure the project has considered each of the following:

Heating Requirement

Has the required wattage been calculated from the characteristics of the building?

Heater Position

Will radiant warmth reach the areas where the congregation actually sits or gathers?

Zoning

Can appropriate areas operate independently where required?

Controls

Do the controls suit the church's real weekly and seasonal usage?

Heritage Impact

Have appearance, mounting and any listed-building requirements been considered?

Long-Term Cost

Have energy, installation and ongoing ownership costs been considered together?

5 Church Heating Mistakes at a Glance

Mistake Potential Problem Better Approach
Using an unsuitable heating approach Poor comfort in a large, tall space Consider targeted radiant heating
Heating the entire building Energy used in unoccupied areas Design appropriate heating zones
Ignoring heritage requirements Visual or installation conflicts Plan mounting and building impact early
Focusing only on purchase price Incomplete long-term cost comparison Assess total cost of ownership
Poor heating schedules and controls Heating operating unnecessarily Match controls to actual church use
Planning a Church Heating Project?

Get the System Design Right Before Choosing the Heaters

A successful church heating project starts with the building itself: its dimensions, ceiling height, construction, pattern of use and the areas that actually need warmth.

Plan Around the Church, Not Just the Heating System

The biggest church heating mistakes usually happen when the heating equipment is considered before the building and its usage.

A church with a high vaulted ceiling, intermittent occupancy and sensitive historic features requires a very different strategy from a conventional domestic or commercial room.

Correct sizing, sensible positioning, appropriate zoning and suitable controls provide a much stronger foundation for an effective infrared heating system.

NEED HELP WITH YOUR PROJECT?

Find the right infrared heating setup for your space.

Use our wattage calculator to estimate your heating requirement, or speak to our team for product and project guidance.

WATTAGE CALCULATOR SPEAK TO OUR TEAM
Previous article The Environmental Benefits of Switching Your Church to Infrared Heating
Next article What to Look for in an Infrared Heater for Public Buildings